Resource Summary
Use this report form to print the totals for each resource that was scheduled in the last run of the Scheduler.
To specify that the Scheduling activity should capture this information, you must select the Load Profile Data and Summary Data fields on the Resources form for each resource you want to track.
For each resource, the report includes this information:
- On-Shift Capacity: The total hours this resource was on-shift during the Scheduling period. "On-shift" refers to a shift period where the resource was available to work
- Total Load: Total run hours the resource was busy + total hours the resource was in setup + total hours the resource was blocked
- Percent Load: Total load (described above) + total on-shift hours * 100
- Run: The total hours the resource was busy working on an operation
- Setup: The total hours the resource was being set up
- Idle: The total hours the resource was not working on any load (during an on-shift period)
- Blocked: The total hours the resource was blocked; for example, an operation requires 2 resources, both of which are allocated, but then one goes off shift while the other is still on shift: the resource that is still on shift would be blocked
- # Jobs: Average number of jobs waiting for the resource during the scheduling period
- Time: The minimum hours any load had to wait for the resource
- # Jobs Run: The number of jobs the resource processed
- # Loads Wait: The number of times any load waited for the resource
You can produce this report for a range of resources, resource groups, resource types, and percent loads.
Related topics