Job Cost Variance Report
This report prints the cost breakdown of the selected jobs. This report displays the cost of a job with its components, such as setup, run, tools, and overhead. The report displays in order by job number.
The report can include the estimate, planned, current, standard, and actual break down of cost amounts. You can select the following types of variances to print on the report:
- Planned vs. Actual
- Estimate vs. Actual
- Current vs. Actual
- Standard vs. Actual
For co-product jobs, this report prints by range of co-product mixes, a listing of co-products at the job level. A breakdown of variances for actual costed co-products is also included.