Resource Group Load Profile - Scheduler
Use this form to view the utilization and load for all resources in a specific resource group at various points in time. All values are cumulative for all resources in a given resource group. This form does not display any information until you run the Scheduling activity.
Each row in the grid next to the graph displays a single interval in time for the resource group, based on the setting of the Intervals field. The intervals are listed in chronological order. Use the built-in scroll bar to display data for additional intervals.
The graph shows the resource group's load profile for the record selected in the grid. The Backlog display option shows the backlog hours for all resources in the group. The Utilization option shows the percentage of the resources' on-shift hours that are being utilized as well as the percentage of the on-shift hours the resources spent in setup. If there are no load hours for a given interval record, no graph will display for it.
Below the graph, Overall Equipment Effectiveness (OEE) data displays.
The
menu includes these options:- : View details about the job and operations performed by the resources in this resource group during the last schedule run.
- : View the backlog of work for a resource group at the beginning of the specified Start Date.