Low Level Coding
The lowest position in which a material can appear in a BOM (bill of material). This represents the sequence in which items are run through MRP (Materials Requirements Planning). The requirements for low level 3 must be determined before the requirements for level 4 so that all independent and dependent demand requirements are known.