Adding Contract Lines
For each item entered on a contract, a line is required. Follow these steps to add a contract line:
- On the Service Contract Lines form, select Actions > New.
- Specify this header information:
- Contract
- Select the contract for which you are adding lines.
- Contract Status
- The status of the service contract is displayed.
- Service Type
- The
service type of the contract is displayed. The codes are set up and maintained
through the
Service Types form.
A default value for new contracts can be set on the Contract Parameters tab of the Service Parameters form.
- Line
- The next available unique line number for this contract is automatically generated.
- Unit
- A unit is a complete material composition, including all subcomponents, replacement parts, and/or add-ons. Each unit is identified with a unique alphanumeric ID. This ID can be the serial number of the unit, but it does not have to be the serial number. If it is a serial number, that number does not have to exist in the Service Serials form. This allows you to service units that you did not manufacture.
- Available
- Click this button to launch the modal Service Contract Item Availability form to display how many of the item are in stock and the status of currently rented units.
- Item
- The item number is displayed.
- Description
- A brief description of the item is displayed.
- Quantity
- Specify the number or amount of units/items to be used on transaction, order, and so on.
- U/M
- Select the abbreviation for the unit of measure used to quantify the number of units or items.
- Customer PO
- Select the customer PO that relates to the contract line.
- Specify this information on the
Ranges tab:
- Start Date
- Select he calendar date when the contract or contract line starts.
- Projected Due Date
- Select an estimated date for when the contract line item will be returned.
- Minimum Bill Thru
- Select a date. The contract line will be billed through this date, even if the contract ends earlier than the date specified.
- End Date
- The calendar date when the contract or contract line ends is displayed.
- Billed Thru
- The date through which the contract or contract line has been invoiced is displayed.
- Start Meter
- The beginning meter reading of the unit or item is displayed.
- Current Meter
- The present meter reading of the unit or item is displayed.
- End Meter
- The meter reading of the unit or item at contract end is displayed.
- Billed Thru Meter
- The meter reading at the time that the last contract invoicing was performed is displayed.
- Allowance
- Specify the value to allow before incurring charges on contract lines. The calculation used the difference between the Start Meter and Current Meter fields.
- As Of
- The date through which the displayed meter ranges are accurate.
- Specify this information on the
Billing tab:
- Billing Frequency
-
See Billing Frequency.
- Price Basis
- Select the method which will be used for calculating charges when invoicing the contract line. A default value for new contract lines can be set on the Contract Parameters tab of the Service Parameters form.
- Rate
-
Specify the contract rate. This value is used with the Per fields to calculate the charges for service contract lines.
- Prorate Rate
- Specify a rate if you are going to prorate the contract.
- Meter Rate
- Specify the meter rate for the contract.
- Per
- Select the contract line unit of rate. This value is used in
conjunction with the rate to determine the amount of charges to apply to a
contract line.
- Hour: Multiply rate for the contract line on an hourly basis
- Day:Multiply rate for the contract line on a daily basis
- Week: Multiply rate for the contract line on a weekly basis
- Month: Multiply rate for the contract line on a monthly basis
- Year: Multiply rate for the contract line on a yearly basis
- Include Waiver Charge
- Select this check box to include the waiver charger amount for the contract line.
- Contract Basis
- This field is for informational purposes only and is used by the entrant of the contract line to list the base or estimated amount to be used for the contract.
- Total Billed
- The running total of invoiced charges for the service contract or contract line is displayed.
-
Specify this information on the
Entitlements
tab:
- % Of Labor Covered
- Specify the percentage amount that a customer is charged for
each labor transaction. As service transactions are posted for the particular
unit or item under contract, the system will automatically calculate the price
of the transaction based on the percentage not covered. The entitlement
calculation can also take into account different percentages based on the
service order SRO Type, the Work Code of the labor transaction, or a
combination of the two.
For example, if expenses are completely covered, then the percent of coverage would be set to 100%. If only 10% of transaction is going to be charged, then the percent of coverage would be set to 90%.
- % Of Material Covered
- Specify the percentage amount that a customer is charged for
each material transaction. As service transactions are posted for the
particular unit or item under contract, the system will automatically calculate
the price of the transaction based on the percentage not covered. The
entitlement calculation can also take into account different percentages based
on the service order SRO Type, the Family Code of the item on the material
transaction, or a combination of the two.
For example, if expenses are completely covered, then the percent of coverage would be set to 100%. If only 10% of transaction is going to be charged, then the percent of coverage would be set to 90%.
- Specify this information on the
Tax Info tab:
- Tax Code
- Select the tax code, which represents how the sales tax is calculated. The codes are set up and maintained on the Tax Codes form.
- The
Contract Surcharges tab
shows a grid display of surcharges.
Note: Negative contract surcharges are not supported.
- Save the new record.