Creating an Engineering Change Notice Line Item
ECN line items define the changes to the inventory item, job order, or estimate job, at an operation, material, or material reference level.
- Open the Engineering Change Notice Items form.
- Select Actions > New. The ECN must have a status of Requested.
-
Enter data in the required fields:
Note: Operation, Materials, or References refers to the inventory item's current operations, materials, or material references.
Line Item Required Fields Operations Work Center, Move, Queue, Setup, Offset, Backflush, Mach Hrs per Piece or Pieces per Mach Hr, Labor Hr per Piece or Pieces per Labor Hr Materials Seq, Type, Quantity, U/M, Probable, Increm Price, Ref Type, Per/Unit or Lot, Unit of Measure Costs Material, Labor, Fixed Overhead, Variable Overhead, Outside References Seq, Reference Seq The ECN Line Items fields are:
- Status: Select the status of the ECN line item or accept the default option, which is Requested.
- Action: Enter the action to take with this particular line item or accept the default option, which is Updated.
-
Select Actions > Save.