Rolling Up Costs for Costing Analysis
Any time you add or change items in a costing alternative record, you must roll up the new item costs using the Costing Analysis Alternative Roll Up form. You will know that a rollup is needed when the Roll Up check box on the Costing Analysis Workbench form is selected. Frozen costing alternatives cannot be rolled up.
When you roll up costs in a costing alternative set to Copy Routing, that routing is copied into the costing alternative and accessed on the Costing Analysis Alternative Current Operations and Costing Analysis Alternative Current Materials forms. The Change Cost Rates utility may be used to make changes to the cost rates in the alternative current operations, if the costing alternative is not frozen.
When you roll up costs in a costing alternative for which the routing was not copied, the routing for the selected BOM Type is used as the basis, and any new rates from the Product Codes, Departments, Work Centers, and Materials tabs are applied to calculate the new unit costs. The Change Cost Rates utility and Substitute Bill of Materials Components utility do not apply to costs on these tabs.
To roll up new item costs: