Configuring an Estimate Job
To configure an estimate job, do the following:
After processing, the system updates the Estimate Job Orders form with the configuration information.
- For a configurable job/item with an incomplete configuration, or
which has not been configured at all, the
When a configuration is complete, the
button changes to .
button
remains enabled.
- If
Auto Job Generation is
set to
Always for this item on the
Items form
Configuration tab, a
cross-reference job is automatically created.
If Auto Job Generation is set to Prompt, the system asks if you want to create a cross-reference job.
- Rules can be defined that place an
Infor Configure Price Quote
configuration on hold if, for example, an option in the configuration requires
approval. When the original user completes the configuration, the
button for
the line is set to
, and the
Config Hold field is
selected. When a configuration is approved, you can either reconfigure the
estimate job to remove the hold in
Infor CPQ,
or you can select the
menu option in
CloudSuite Industrial.
The button label is updated to
and
the
Config Hold field is
cleared.
The configuration hold extends to any sub-jobs. Those sub-jobs cannot be released until the hold is removed.